Operational
CAGE6EMC9

BGA TEST & TECHNOLOGY has developed a reliable and repeatable process, in compliance with the objectives and requirements of IEC/TS62647, for re-balling and ball attach with the capability to convert Pb-free spheres to Eutectic Solder (Sn63Pb37) or High Lead solder (Sn10Pb90) spheres for Military, Aerospace, and other High-Reliability Electronic Assemblies.

This process will also work in reverse to convert tin-lead spheres to Pb-free (SAC305) spheres for many commercial applications with RoHS restrictions.

Brief Description of Process

After going through a QA gate upon arrival, incoming lots undergo the following steps:

  • ▸Incoming Inspection Process
  • ▸Moisture Removal — Pre-Bake
  • ▸De-balling: Automatic Using Six Axis ROBOT — Solder Sphere removal process
  • ▸Automated Cleaning: Trident LD system
  • ▸Inspection Post Deballing
  • ▸Moisture Removal — Post Deball
  • ▸Re-balling: Proprietary Solder Sphere attachment process
  • ▸Automated Cleaning: Trident LD DE fluxer system
  • ▸Drying Post Re-ball
  • ▸Baking to remove Moisture post Re-ball
  • ▸Final Inspection Process
  • ▸Marking If Required
  • ▸Marking Inspection
  • ▸Final Baking Per MSL of the Component
  • ▸Packaging and Shipping

Devices pass through the process cycle with strict quality and process control for repeatable and reliable results. Our Re-balling process has been proven to meet the requirements of ADHP (Aerospace, Defense, and High Performance) industries using the following qualification criteria:

  • ▸CSAM (Pre & Post Re-balling) — Analysis for De-lamination
  • ▸Ball Shear — Strength of ball adhesion
  • ▸Coplanarity Test
  • ▸Scanning Electron Microscope (SEM) — Post-Ball Shear Analysis
  • ▸Cleanliness — Ionic Contamination Analysis
  • ▸Electrical Testing (Pre & Post Re-balling)

Please contact us for more information or quote.

sales@bgatechnology.com — Reballing

Need Help?

Call BGA Today: 631-750-4600

Request Quote →
Call Now